|
Expert Team on the Evolution of global observing systems,
Seventh Session
|
Agenda item |
Doc. No. |
Title |
Submitted by |
Deadline |
n/a |
INF1 |
Secretariat |
Done |
|
n/a |
INF2 |
Secretariat |
Done |
|
n/a |
INF3 |
Secretariat |
Done |
|
1 |
n/a |
Organization of the Session |
n/a |
n/a |
1.1 |
n/a |
Opening of the meeting |
n/a |
n/a |
1.2 |
1.2(1) |
Secretariat |
Done |
|
1.2 |
1.2(2) |
Secretariat |
Done |
|
1.3 |
INF4 |
Secretariat |
Done |
|
2 |
2 |
J. Eyre |
Done |
|
3 |
3 |
L.P. Riishojgaard |
Done |
|
4 |
4 |
J. Eyre |
Done |
|
5 |
5 |
Secretariat |
Done |
|
6 |
n/a |
Review of other activities related to ET-EGOS and OPAG-IOS |
n/a |
n/a |
6.1 |
6.1 |
Secretariat |
Done |
|
6.2 |
6.2 |
Secretariat |
Done (REV1) |
|
6.3 |
6.3 |
Secretariat |
Done |
|
7 |
7 |
WMO Integrated Global Observing System (WIGOS) (short progress report) |
Secretariat |
Done |
8 |
n/a |
Rolling Review of Requirements and Statements of Guidance |
n/a |
n/a |
8.1 |
8.1 |
Secretariat |
Done |
|
8.2 |
8.2 |
Secretariat |
Done |
|
8.3 |
n/a |
Statements of Guidance (SoGs) |
n/a |
n/a |
8.3.1 |
8.3.1 |
J. Eyre |
Done |
|
8.3.2 |
n/a |
Review of Statements of Guidance |
n/a |
n/a |
8.3.2 |
8.3.2(1) |
E. Andersson |
Done |
|
8.3.2 |
8.3.2(2) |
T. Montmerle |
Done |
|
8.3.2 |
8.3.2(3) |
A. Bell |
Done |
|
8.3.2 |
8.3.2(4) |
L. Ferranti |
Done |
|
8.3.2 |
8.3.2(5) |
J. van der Meulen |
Done |
|
8.3.2 |
8.3.2(6) |
Secretariat |
Done |
|
8.3.2 |
8.3.2(7) |
Secretariat |
Done |
|
8.3.2 |
8.3.2(8) |
Secretariat |
Done |
|
8.3.2 |
8.3.2(9) |
Hydrology and Water Resources |
Secretariat |
23 March 2012 |
8.3.2 |
8.3.2(10) |
Update on climate observing requirements1 (including Climate monitoring/GCOS and GFCS |
C. Richter |
23 March 2012 |
8.3.2 |
8.3.2(11) |
W. Wright |
Done |
|
8.3.2 |
8.3.2(12) |
T. Onsager |
Done |
|
8.3.2 |
8.3.2(13) |
B. Goodison |
Done |
|
8.3.2 |
8.3.2(14) |
GTOS (i.e. the non GCOS requirements of GTOS) |
J. Latham |
23 March 2012 |
9 |
9 |
E. Andersson |
Done |
|
9.1 |
n/a |
Update on recent OSEs/OSSEs |
n/a |
n/a |
9.2 |
n/a |
Proposal for new OSEs/OSSEs to be promoted by ET-EGOS |
n/a |
n/a |
9.3 |
n/a |
Next OSE/OSSE workshop |
n/a |
n/a |
10 |
n/a |
Implementation Plan for the Evolution of Global Observing systems (EGOS-IP) |
n/a |
n/a |
10.1 |
n/a |
Review of progress against current EGOS-IP (2015) |
|
|
10.1.1 |
10.1.1 |
R. Stringer |
Done |
|
10.1.2 |
10.1.2 |
Secretariat (J. Lafeuille) |
Done |
|
10.2 |
INF 6 |
Development of the new EGOS-IP (2025) 1) draft EGOS-IP v12.02 form the ET-EGOS-7 preparatory meeting |
Prep. meeting |
Done |
10.2.1 |
10.2.1 |
J. Eyre, Secretariat (E. Charpentier), and J. Pailleux |
Done |
|
10.2.2 |
n/a |
Review of feedback on draft EGOS-IP |
n/a |
n/a |
10.2.2 |
10.2.2(1) |
K. Monnik |
Done |
|
10.2.2 |
10.2.2(2) |
M Kalb |
Done |
|
10.2.2 |
10.2.2(3) |
L. Machado |
Done |
|
10.2.2 |
10.2.2(4) |
F. Grooters |
Done |
|
10.2.2 |
10.2.2(5) |
S. Goldstraw |
Done |
|
10.2.2 |
10.2.2(6) |
R. Saunders |
Done |
|
10.2.2 |
10.2.2(7) |
Secretariat (M. Ondras) |
Done |
|
10.2.2 |
10.2.2(8) |
Feedback on the EGOS-IP from AMMA |
M. Kadi / O. Roussout |
23 March 2012 |
10.2.2 |
10.2.2(9) |
GCOS Secretariat (C. Richter) |
Done |
|
10.2.2 |
10.2.2(10) |
S. Klink |
Done |
|
10.2.2 |
INF. 5 |
M. Sonko |
Done |
|
10.2.3 |
n/a |
Preparation of the new version of the EGOS-IP |
n/a |
n/a |
11 |
n/a |
Preparation for the forthcoming CBS meetings |
n/a |
n/a |
11.1 |
n/a |
Action Plan |
n/a |
n/a |
11.2 |
n/a |
Draft report to ICT-IOS-7 and CBS-XV |
n/a |
n/a |
12 |
n/a |
Any other business |
n/a |
n/a |
13 |
n/a |
Closure of the Session |
n/a |
n/a |
Note 1: Please provide a short report regarding status of the Statement of Guidance (i.e. whether the most current version is up to date, whether it is under review and by whom, whether consideration of specific requirements should be included, etc.), and any other related issue that needs to be raised with the ET-EGOS, in particular any key gap that ought to be considered for the new EGOS-IP. Optionally, a revised SoG may be submitted as an annex with the document.
Note 2: The document should elaborate on (i) how the observational requirements for the GFCS are currently taken into account within existing SoGs, and propose how these should be updated if needed
Note 3: The document should elaborate on (i) how the observational requirements for the GCW are currently taken into account within existing SoGs, and propose how these should be updated if needed, and (ii) the possible need for new application area(s) to address the observational requirements of the GCW not covered as part of existing application areas and their respective SoGs.
Note 4: Short summary with possibly additional information in Annex(s) if needed
![]() |