Session II: Introduction to Package 6 "Design a Regional Multi-Hazard Early Warning System composed of harmonized National Early Warning Systems", project time line and milestones towards the design of the MHEWS for the beneficiaries with a regional cooperation framework
Introduction to Package 6, project time line and milestones - Maryam Golnaraghi (WMO)
Session III: Potential assistance for the development of the relevant product and services of the IPA Project beneficiaries* with the view to enhance the capacity of the NMHSs to provide the required information service in support of the Disaster Risk Management agencies decision-making.
Transboundary Cooperation on Hydrological and Meteorological Issuesat the Sava River Basin Level- Samo Grošelj, International Sava River Basin Commission
Flood Early Warning System for Drin/Drim, Buna/Bojana Basin, Climate Change Adaptation in Western Balkans, - Jakob Doetsch, Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ)
WMO RA VI RCC Network contribution - Stefan Rösner, Head Division Regional Climate Monitoring, Coordinator WMO RA VI RCC Network, Deputy GCOS German Coordinator
Operational function and R&D activities in support to MHEWS in South East Europe at RHMSS-SEEVCCC - Goran Mihajlović Head of the Center for hydrometeorological system for early warning and alerts