CBS Implementation/Coordination Team on Integrated Observing Systems (ICT/IOS) , Seventh Session
(Geneva, Switzerland, 18-22 June)


Documentation plan
(updated 18-Jun-2012 )

Agenda item

Doc No.

Doc title

Submitted by

Deadline

n/a

INF. 1

Local information

Secretariat

Done

n/a

INF. 2

Documentation plan

Secretariat

Done

n/a

INF. 3

Provisional List of Participants

Secretariat

In-session

1.2

1.2(1)

Provisional agenda

Secretariat

Done

1.2

1.2(2)

Annotated provisional agenda

Secretariat

Done

1.3

1.3

Working arrangements and time table

Secretariat

Done

2

2(1)

Report of the Chairman

L.P. Riishojgaard

Done

2

2(2)

Database on Observing Systems Requirements and Observing Systems Capabilities

Secretariat/ L.P.Riishojgaard

Done

3

3(1)

WIGOS (see note 1)
Status of WIGOS Implementation

Secretariat

Done

3

3(2)

WIGOS Implementation Plan

Secretariat

Done

3

3(3)

Support of ICT-IOS to WIGOS implementation

Secretariat

Done

4.1

4.1

Status of RBSN/RBCN

Secretariat

Done

4.2

4.2

Status of GSN/GUAN/GRUAN

GCOS Secr./J. Lawrimore

Done

4.3

4.3

Status of Marine and Oceanographic Observations

Secretariat

Done

4.4

4.4

Status of Polar and Cryospheric Observations

Secretariat

Done

4

4(1)

Status of the surface-based sub-system of the GOS in Region I

M. Sonko

Done

4

4(2)

Status of the surface-based sub-system of the GOS in Region II

M. Ranalkar

Done

4

4(3)

Status of the surface-based sub-system of the GOS in Region III

G. Torres

Done

4

4(4)

Status of the surface-based sub-system of the GOS in Region IV

W. Stolz

Done

4

4(5)

Status of the surface-based sub-system of the GOS in Region V

R. Stringer

Done

4

4(6)

Status of the surface-based sub-system of the GOS in Region VI

K. Schreiber

Done

4

4(7)

Status of the surface-based sub-system of the GOS in the Antarctic(See also Docs 4.4 and 4(8))

Secretariat

Done

4

4(8)

Performance Monitoring Results

Secretariat

Done

5

5

Status of the space-based components of the GOS: Operational Component; Research Component; Global Satellite Intercalibration

Secretariat

Done

6.1

6.1

Report of the ET-AIR (see note 2)

F. Grooters

Done

6.2

6.2

Report of the ET-AWS (see note 2)

K. Monnik

Done

6.3

6.3

Report of the ET-EGOS (see note 2)

J. Eyre

Done

6.4

6.4

Report of the ET-SBRO (see note 2)

S. Goldstraw/ Secr.

Done

6.5

6.5

Report of the ET-SAT (see note 2)

M. Kalb

Done

6.6

6.6

Report of the ET-SUP (see note 2)

L. A. Machado

Done

6.7

6.7

Report of the Rapporteur on GCOS Matters (see note 2)

J. Lawrimore

15/5/2012

6.8

6.8(1)

Observing System Experiments and Observing System Simulation Experiments (see note 2)

E. Andersson,  Y. Sato

Done

6.8

6.8(2)

Outcome and recommendations of the WMO Workshop on the Impact of Various Observing Systems on NWP

E. Andersson, Y. Sato

Done

6.9

6.9

Report of the Rapporteur on Regulatory Material

A. Vasiliev

Done

6.10

6.10

Radiofrequencies matters

J. Arimatea Brito/
D. Thomas

Done

7.1

7.1(1)

New Implementation Plan for the Evolution of the GOS

J. Eyre

Done

7.1

7.1(2)

Integration of EGOS-IP with WIGOS-IP

F. Branski

15/5/2012

8.1

8.1

Terms of Reference of the Expert Teams

All ET Chairs

In-session

8.2

8.2

Terms of Reference of Rapporteurs

All Rapporteurs

In-session

8.3

8.3

Work Plans

All ET Chairs

In-session

8.4

8.4

Additional Recommendations to CBS XV (i.e. beyond those proposed by the Expert Teams and the Rapporteurs as part of their reports under item 6)

Chair, ICT-IOS

In-session


Note 1
: Proposals from the Expert Teams and Rapporteurs regarding WIGOS implementation shall be included in the respective Expert Team and Rapporteur reports .

Note 2: Report by the Expert Team or Rapporteur shall include follow the proposed template, and include a section on the Expert Team or Rapporteur contribution towards WIGOS implementation

 





top
Top

line


 
©2016 World Meteorological Organization, 7bis, avenue de la Paix, CP No. 2300, CH-1211 Geneva 2, Switzerland - Tel.: +41(0)22 730 81 11 - Fax: +41(0)22 730 81 81Disclaimer | UN System | Accessibility

 

  Extranet Homepage Website Public Comms