Expert Team on WIS-GTS Operation and Implementation
Info on the meeting
Location: Geneva
Date: 22 Sep - 24 Sep 2010
Registration: 9am. Meeting 9:30am
Meeting Room: 7 Jura
Chair: Kelvin Wong
WMO contacts:
David Thomas ,
Pierre Kerhervé
Register for the meeting
Core members will be sent an official invitation. Associate members are also welcome to register by
submitting a form to the Director of WIS pshi@wmo.int
Upon receipt of a request, the secretariat will coordinate with the chair to arrange for an invitation to be sent to the member's WMO Permanent Representative requesting participation of the member.
Reference documents
1. ORGANIZATION OF THE MEETING
1.1. Opening of the meeting
1.2. Adoption of the agenda
1.3. Working arrangements
2. WIS PART A IMPLEMENTATION AND TRAFFIC ANALYSIS
2.1. Status reports from RTHs
2.1.2. Status of RTH Brasilia ( Report) |(presentation)
2.1.3. Status of RTH Buenos Aires ( Report and Presentation) (if the word no "such document exists" go to ET-CTS or login to wiki)
and if available ...
2.1.10. Status of RTH Algiers (Report)|(Presentation)
2.1.11. Status of RTH Bangkok (report)|(presentation)
2.1.12. Status of RTH Brazzaville (report)|(presentation)
2.1.13. Status of RTH Cairo (report)|(presentation)
2.1.14. Status of RTH Dakar(report)
2.1.15. Status of RTH Jeddah(report)|(presentation)
2.1.16. Status of RTH Khabarovsk(report)|(presentation)
2.1.17. Status of RTH Lusaka(report)|(presentation)
2.1.18. Status of RTH Maracay (report)|(presentation)
2.1.19. Status of RTH New Delhi (report)|(presentation)
2.1.20. Status of RTH Niamey(report)|(presentation)
2.1.21. Status of RTH Norrkoping(report)|(presentation)
2.1.22. Status of RTH Novosibirsk(report)|(presentation)
2.1.23. Status of RTH Offenbach (Report) | ( Presentation )
2.1.24. Status of RTH Prague(report)|(presentation)
2.1.25. Status of RTH Pretoria (report)|(presentation)
2.1.26. Status of RTH Rome (report)|(presentation)
2.1.27. Status of RTH Sofia (report)|(presentation)
2.1.28. Status of RTH Tashkent (report)|(presentation)
2.1.29. Status of RTH Tehran (report)|(presentation)
2.1.30. Status of RTH Vienna (report)|(presentation)
2.1.31. Status of WMC Washington (report)|(presentation)
2.1.32. Status of RTH Wellington (report)|(presentation)
2.2. Traffic analysis for GISC network bandwidth requirement
2.2.1. Submitted Report
2.4. Management and operational aspects of DCPC and NC in areas of GISC
2.4.1. Management and operational aspects of DCPC and NC in areas of GISC (Report)
3. REVIEW OF THE MONITORING RESULTS OF THE OPERATION OF THE MTN
3.1. Monitoring results of AGM, SMM and IWM
3.2. Differences in the availability of reports at MTN centres during monitoring exercises
3.2.1. Comparison monitoring results( Report )
3.3. Timeliness of reception of bulletins at MTN centres
3.3.1. Time of reception of bulletins( Report )
3.4. Routeing and monitoring of CLIMAT bulletins and GCOS GSNMC monitoring reports
4. PROCEDURES FOR THE COLLECTION, ROUTEING AND DISTRIBUTION OF DATA AND PRODUCTS
4.1. Meteorological Bulletins
4.1.2. Procedures for transmitting and collecting meteorological bulletins using email and web (to be presented in joint session with ET-CTS in agenda item 7)
4.2. Abbreviated Headings
4.2.1. Incorrect use of abbreviated headings (Report)
4.2.4. Delivery of corrected and delayed TAC and BUFR bulletins
4.2.5. Changes of Original Message Content and Their Impact on the GTS and User (Report)
4.2.6. Abbreviated headings for satellite data bulletins (Report)
4.3.1. Monitoring of the Migration to TDCF for RBSN stations - Result of WWW Monitoring (Report)
4.3.2. Status of the national plans for the migration to TDCF and step-by-step migration by zone (Report)
4.4.1. Common Alerting Protocol over GTS (Presentation)
4.5. Implementation of the file-naming convention ( Report )
5.2. Status of updates of the catalogue of meteorological bulletins and routeing catalogues ( Report Doc5.1(1))
5.3. GeoNetwork and WIS DAR interface
6. QUANTITY MONITORING OF THE OPERATION OF THE WWW
6.1. Quantity monitoring of the operation of the WWW (Report)
6.2. Development of integrated quantity WWW monitoring application ( Report and presentation )
6.3. Review of monitoring procedures and design of improved quantitative statistics
7. WIS PLAN AND ROADMAP
7.1. Development of Manual on WIS and Guide to WIS Presentation
7.2. Update on WIS centre identification process
7.3. Network monitoring and planning for WIS
8. Any other business
8.1. Collaboration with other expert teams and working groups
8.1.1. IPET-DRC
9. CLOSURE OF THE MEETING