CBS-demo
Welcome to the page about the CBS Ext 10 demo
Objective
Presentation of WIS to CBS Ext 10. Synchronization of multiple GISCs.For the presentation we will need a new version of "the script", this time
with more participants. For the synchronization we will this time have to synchronize multiple GISCs.
Status of the test
The current status of the tests can be checked with this tool provided by JMAActivities
- notes of the third telco on the 11th of October
- the testing is going on.. we now have a troubleshooting page
- there was a second telco on the 30th of August on the tests
- briefing notes for the second telco on 30th of August now online.
- there was a preparatory telco on the 18th of August about testing to synchronize multiple GISCs.
- briefing notes for the telco now online.
Issues
- JMA to solve "gml:TimePeriod" validation error.
- CMA to check why connection to INMET geonetwork node has timeouts and how often they ocurr (make harvester more resilient??)
- INMET to create missing WITEST-#CENTER# sets
- INMET localhost in schemaLocation
Information
synchronization logfile
Here is the logfile
current OAI provider list
- CMA OAI : http://wisportal.cma.gov.cn:7090/wis/provider?verb=ListSets
- DWD OAI: http://china2.dwd.de:8080/oai/provider?verb=ListSets
- INMET OAI: http://85.10.219.212/geonetwork/srv/en/oaipmh?verb=ListSets
- JMA OAI: http://www.shiken.kishou.go.jp/metasearch/oaiprovider.jsp?verb=ListSets
Script
The EC "script" was well received. We will have to work on a new version with more participants.Posters
There will be space for posters, so WIS centres wanting to tell other WMO members about their implementation can hang up information. A poster session is also planned.Comments / Remarks
Please feel free to update.