Programmes > WWW > CBS > Meetings > ET-EGOS 6


Expert Team on the Evolution of global observing systems

Sixth Session
Geneva, Switzerland, 14 - 17 June 2011

Documentation plan

( 16-Jun-2011 )

 

 Agenda items  Title Doc. No.   Submitted by   Deadline 
 1

ORGANIZATION OF THE SESSION

1.1

Opening of the Meeting

n/a
-
n/a
1.2

Adoption of the Agenda:

1.2(1)
Secretariat
Done
1.2(2)
Secretariat
Done
1.3

Time table

INF-4
Secretariat
Done
n/a

Practical information on Geneva for participants

INF-1
Secretariat
Done
n/a

Provisional list of Participants

INF-2
Secretariat
Done (rev1)
n/a

Documentation Plan

INF-3
Secretariat
Done
2

REPORT OF THE CHAIRPERSON

2
J. Eyre
Done
3

GUIDANCE FROM CHAIRPERSON OF THE OPAG-IOS

3
Lars Peter Riishojgaard
Done
4

PROGRESS ON ET-EGOS WORK PLAN FOR CBS

4
J. Eyre
Done
5

REVIEW OF ACTIONS

5
Secretariat
Done
  6  

REVIEW OF OTHER ACTIVITIES RELATED TO ET-EGOS AND OPAG-IOS

6.1

THORPEX

6.1
Roger Saunders
Done
6.2

WMO Polar Activities (incl. IPY Legacy, and GCW)

6.2
Secretariat
(M. Ondras)
Done
6.3

AMMA
(Main doc, Appendix B)

6.3
AMMA Project Office
Done
6.4

AMDAR

6.4
F. Grooters
Done
6.5

GCOS  

6.5
Jay Lawimore
Done
6.6

EUCOS

6.6
S. Klink
Done
 7

WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)

7
Secretariat
(I. Zahumensky)
Done (rev1)
 8

ROLLING REVIEW OF REQUIREMENTS AND STATEMENTS OF GUIDANCE

8.1

Review status of database of User Requirements

8.1(1)
Secretariat
(J. Lafeuille)
Done
8.1

Strategy for the Evolution and Future hosting of the RRR Database

See also the Technical Specifications for the evolution and future hostingof the RRR Database (v 1.2)

8.1(2)
Secretariat
(E. Charpentier)
Done
8.2

Review status of database of Observing system Capabilities

8.2
Secretariat
(J. Lafeuille)
Done
8.3

Statements of Guidance (SoGs)

8.3.1

Overview of status

8.3.1 Rev. 1
J. Eyre
Secretariat
(E. Charpentier)
Done (rev1)
8.3.2

Consider newly revised SoGs

8.3.2
8.3.2(1)
E. Andersson
Done
8.3.2
8.3.2(2)
T. Montmerle
Done
8.3.2
8.3.2(3)

J. van der Meulen
Secretariat
( H. Pümpel)

Done
8.3.2
8.3.2(4)
A. Bell
Done
8.3.2
8.3.2(5)
Secretariat
(O. Tarasova)
Done
8.3.2
8.3.2(6)
Secretariat
(E. Cabrera)
Done (rev1)
8.3.2
8.3.2(7)
Secretariat
(R. Stefanski)
Done
8.3.2
8.3.2(8)
Secretariat
(W. Grabs)
Done
8.3.2
8.3.2(9)
L. Ferranti
Done
8.3.2
8.3.2(10/1)
C. Richter
Done
(rev 1)
8.3.2
8.3.2(10/2)
Secretariat
(B.J. Ryan)
Done
8.3.2
8.3.2(10/3)
Secretariat
(B. Goodison)
Done
(rev1)
8.3.2
8.3.2(11)
W. Wright
Done
8.3.2
8.3.2(12)
T. Osanger
Done
8.3.2
  • GTOS (i.e. the non GCOS Requirements of GTOS)
8.3.2(13)
J. Latham
13 May
8.3.3

Consider areas requiring revised SoGs

n/a
n/a
n/a
8.3.4

Consider other areas requiring new SoGs, including new elements of WIGOS

n/a
n/a
n/a
9

OBSERVING SYSTEM STUDIES

9
E. Andersson
Done
9.1

Update on recent OSEs/OSSEs

n/a
n/a
n/a
9.2

Proposal for new OSEs/OSSEs to be promoted by ET-EGOS

n/a
n/a
n/a
9.3

Next OSE/OSSE Workshop

n/a
n/a
n/a
 10

IMPLEMENTATION PLAN FOR EVOLUTION OF GLOBAL OBSERVING SYSTEMS (EGOS-IP)

10.1

Review of Guidance from ECs and Congress on WIGOS

10.1

n/a
n/a
10.2

Summary of Progress Actions in Region I4

10.2(1)
M. Sonko
13 May
10.2

Summary of Progress Actions in Region II²

10.2(2)
M. Ranalkar
Done
10.2

Summary of Progress Actions in Region III²

10.2(3)
G. Torres
Done
10.2

Summary of Progress Actions in Region IV²

10.2(4)
W. Stolz
Done
10.2

Summary of Progress Actions in Region V²

10.2(5)
R. Stringer
Done
10.2

Summary of Progress Actions in Region VI²

10.2(6)
K. Schreiber
Done
10.2

Review of feedback from NFPs

(Appendix: 2009 and 2010 national reports) - updated version 16 June

10.2(7)
R. Stringer
Done
10.2

Summary of actions relevant to the AMMA Project

10.2(8)
M. Kadi
O. Roussout

Done

(see doc 6.3 above)

10.3

Review of progress and actions on the current EGOS-IP (2015)

10.3
n/a
n/a
10.4

Development of the new EGOS-IP (2025)

10.4
J. Eyre
Done
 11

ANY OTHER BUSINESS

 12

PREPARATION FOR THE FORTHCOMING CBS MEETINGS

12.1

Action Plan

n/a
n/a
n/a
 13

CLOSURE OF THE SESSION

Notes:
1: Please provide either (i) a draft updated (or new) SoG, or (ii) a short report explaining why there is no updated SoG (e.g. no change required, pending, etc.), and any other related issue that needs to be raised with the ET-EGOS.

2: The document should elaborate on (i) how the observational requirements for the GFCS are currently taken into account within existing SoGs, including the GCOS-IP, and the Climate (other aspects - CCl) SoG, and propose how these should be updated if needed, and (ii) the possible need for new application area(s) to address the observational requirements of the GFCS not covered as part of existing application areas and their respective SoGs.

3: The document should elaborate on (i) how the observational requirements for the GCW are currently taken into account within existing SoGs, and propose how these should be updated if needed, and (ii) the possible need for new application area(s) to address the observational requirements of the GCW not covered as part of existing application areas and their respective SoGs.

4: Short report, which should be addressing only those EGOS-IP Actions on which there is significant progress or issues to report (i.e. no information is required on  the status of the GOS in the Region)





top
Top

line

©2016 World Meteorological Organization, 7bis, avenue de la Paix, CP No. 2300, CH-1211 Geneva 2, Switzerland - Tel.: +41(0)22 730 81 11 - Fax: +41(0)22 730 81 81Disclaimer | UN System | Accessibility

 

  Extranet Homepage Website Public Comms