WORLD METEOROLOGICAL ORGANIZATION
____________________

COMMISSION FOR BASIC SYSTEMS

OPEN PROGRAMME AREA GROUP
ON INTEGRATED OBSERVING SYSTEMS

EXPERT TEAM ON OBSERVATIONAL DATA REQUIREMENTS
AND REDESIGN OF THE GLOBAL OBSERVING SYSTEM
(REDUCED SESSION)

OXFORD, UNITED KINGDOM, 1 – 5 JULY 2002

Distr.: RESTRICTED

CBS/OPAG-IOS/ODRRGOS-5, INF-1

(22.V.2002)
__________

ITEM: 1.2

 

Original: ENGLISH

 

DOCUMENTATION PLAN

Agenda Item

Title

Doc. No.

Prepared by

Deadline

INFORMATION ON LOCAL ARRANGEMENTS (PDF)

1.2

Provisional Agenda (Word, PDF)

1

Secretariat Done

1.2

Explanatory Memorandum (Word, PDF)

2

Secretariat Done

2

Report of the Chairman (Word, PDF)

3

Dr. P. Menzel 15 June

3

Report on the COSNA/SEG Meeting (Word, PDF)

4

Dr. H. Böttger 15 June

4

Status and Results of OSEs (Word, PDF)

5

Dr. T. Schlatter 01 June

(Word, PDF)

5/Add.1

Dr. H. Böttger 01 June

(Word, PDF)

5/Add.2

Dr. O. Pokrovsky 01 June

(Word, PDF)

5/Add.3

Dr J. Pailleux 01 June

(Word, PDF)

5/Add.4

Dr. N. Sato 01 June

(Word, PDF)

5/Add.5 Dr. J. Eyre 15 June

(Word, PDF)

5/Add.6 Dr. J. Caughey 15 June

5

Review of Recommendations for Evolution of Surface and Space-Based Components of the GOS (Word, PDF)

6

Dr. P. Menzel 01 June
(Word, PDF)

6/Add.1

Dr. J. Eyre 01 June
Doc 6/Add.2 (Word, PDF) and Doc 6/Add.2 Appendix (PDF)

6/Add.2

Secretariat 01 June
(Word, PDF)

6/Add.3

Secretariat 01 June

6

Preparation of the ET Input to the CBS-EXT

7

Dr. P. Menzel 15 June
List of Documents (Word, PDF)

INF-1

Secretariat Done
Provisional List of Participants (Word, PDF)

INF-2

Secretariat Done