WORLD METEOROLOGICAL ORGANIZATION
________

COMMISSION FOR BASIC SYSTEMS

MEETING OF THE EXPERT TEAM ON INFRASTRUCTURE FOR LONG-RANGE FORECASTING


GENEVA, 12-16 NOVEMBER 2001

  CBS ET/ILRF/INF
(31.VII.2001)

_______

 

 

 

Original: ENGLISH

 

DOCUMENTATION PLAN

 

Item

Doc. No.

Submitted by

2

AGENDA

1

Secretariat

2

EXPLANATORY MEMO

2

Secretariat

3

INPUT TO ICTT ON CC ON THE ESTABLISHMENT OF APPROPRIATE OPERATIONAL INFRASTRUCTURE FOR THE PRODUCTION AND EXCHANGE OF LRF

3(Word, pdf)

3(1)(Word, pdf)

 

3(2)(Word, pdf)

3(3)(Word, pdf)

 

3(4)(Word, pdf)

3(5)(Word, pdf)

3(6)(Word, pdf)

Dr Alexander FROLOV

Dr Vernon KOUSKY

 

Mr Jean-Guy DESMARAIS

 

Ms Laura FERRANTI

 

Dr Jim SALINGER

 

Secretariat

 

Secretariat

4

PROCEDURES FOR EXCHANGE OF LRF FORECASTS INCLUDING DEFINING PRODUCTS

4

4(1)(Word, pdf)

4(2)(Word, pdf)

4(3)(Word, pdf)

4(4)(Word, pdf)

4(5)(Word, pdf)

Mr Jean-Guy DESMARAIS

Mr Terry HART

IRI Expert

 

Mr Mike Keith DAVEY

Mr Nobutaka MANNOJI

 

Secretariat

5

EXPERIMENTAL EXCHANGE OF LONG-RANGE FORECASTS AND REPORT OF RESULTS

5(Word, pdf)

5(1)(Word, pdf)

5(2)

 

5(3)

 

5(4)

Dr Chung-Kyu PARK

Mr Ikalafeng KGAKATSI

 

Ms Laura FERRANTI

 

See Doc. 3(1) above

 

See Doc. 4(2) above

6

RECOMMENDATIONS FOR FUTURE CONSIDERATION

6(Word, pdf)

6(1)

6(2)

.

.

.

.

.

Secretariat

 

 

 

 

All members

 

 

 

 

 

 

 

 

To assure that all members participate fully in addition to the assignments above, they are nevertheless invited to submit (preferably written) documents on any of these Items. The deadline for the assignments and any other documents is proposed as 24 October 2001.